
Amazon's AI expansion could run beside a gas plant permitted for 33 million tons of carbon dioxide
Amazon confirmed that it bought a Pecos County, Texas, site for a data center and expects to purchase power from the proposed GW Ranch Energy Center. The Verge reports that the private power project could include 35 natural-gas turbines and 7.65 gigawatts of generation. A Texas Commission on Environmental Quality notice lists maximum greenhouse-gas emissions of 33,212,284.72 tons a year. That figure is the permit ceiling, not a forecast of actual emissions, and the plant may operate below it. It still reveals the scale of infrastructure that a single AI buildout could authorize. Because the power is planned primarily for private demand rather than the public grid, regulators and communities should require transparent utilization, emissions, methane, water, rate, and clean-energy data before construction locks in decades of exposure.
