Analysis frame
Primary-source evidence
Follow how a choice of electricity supply translates a growing digital load into potential local emissions, with explicit modeling limits.
- Residents near generation and industrial facilities
- Utilities, permitting authorities and data-center operators
- Actual buildout, utilization, generation controls and project timing may differ substantially from modeled assumptions.
- The assessment's emissions totals do not establish neighborhood concentrations or specific health outcomes.
- Interim generation choices could lock communities into exposure before cleaner contracted supply becomes available.
- Clear operating and monitoring conditions could reduce disputes by making environmental promises testable.
A scenario is a conditional statement
The assessment combines alternative capacity projections with power-supply configurations and emissions assumptions. Reading a high-end result as a prediction that must happen would remove the very choices the exercise is meant to illuminate.
HARC makes its assumptions and limitations available on the same page. They are part of the evidence, not a footnote to be dropped when a chart travels onto social media.
Locate the decision that changes the result
For an individual proposal, the important questions include generator type, emissions controls, annual operating hours and the timing of grid service. A renewable-energy contract alone does not describe every physical source that may serve a site at every moment.
Those questions need answers from project records and operating data. The statewide model cannot supply the details of an unnamed facility, so our analysis does not attribute its high-end scenario to any particular developer.
Connect the promise to the permit
AIImpactLab would make temporary-power commitments explicit: what counts as temporary, when the arrangement expires, and what happens if the replacement supply is late. Public reporting should make changes in the operating plan visible.
There is a credible alternative to the worst outcome. Projects can use different power mixes, controls and schedules. The point of publishing the range is to show that the result depends on decisions, and to identify who has the authority to make them.
Go to the source
Read the evidence behind this analysis. External links open in a new tab.
HARC — assessment, methods and limitations HARC — data-center research and policy work